BC MEND ML/ARD Annual Workshop

  1. Mayich D. and B. Macdonald. Acid Rock Drainage Dry Covers Site Closure Program. Presented at the 2009 workshop.

    KEYWORDS:  Cape Breton  consolidate  dry cover  Franklyn  geomembrane  Princess  Summit  Victoria Junction 


  2. Isabel D., J. Cyr, A. Hebert and R. Maurice. Aldermac Mine Site Restoration. Presented at the 2009 workshop.

    KEYWORDS:  abandoned  Aldermac  amend lime  consolidate  dam  dry cover  elevated watetable  revegetation  settling pond  spill  tailings 


  3. Hofton T. and R. Schwenger. Geomembrane Cover on Normetal Reactive Tailings: A Case Study. Presented at the 2009 workshop.

    KEYWORDS:  abandoned  consolidate  dry cover  geomembrane  Normetal  spill  tailings 


  4. Maurice R. and M. Wiber. Poirier Mine: HDPE Liner Over Tailings, Performance After Four Years. Presented at the 2004 workshop.

    KEYWORDS:  consolidate  dry cover  geomembrane  impoundment  Poirier  spill  tailings 


  5. Hamblin C.. The Rehabilitation of the Kam Kotia Mine Site: An Exercise in Cover Construction and Water Management. Presented at the 2009 workshop.

    KEYWORDS:  abandoned  consolidate  dry cover  GCL  Kam Kotia  soil barrier  tailings 


Looking for a past presentation?

Our website includes a database of every presentation made at our annual workshops. Use the search tools to the right to find the presentation you are looking for. If you can’t find what you’re after, please feel free to contact us. Click here to browse a list of selected keywords.