BC MEND ML/ARD Annual Workshop

  1. Price W. (Bill). Brief Overview of the Procedures used in the Prediction of Drainage Chemistry from Sulfidic Geological Materials. Presented at the 2006 workshop.

    KEYWORDS:  AP  closure  drainage chemistry  guidelines  kinetic test  NP  operating  PAG  pre-development  prediction 

    Supporting Documents:

    1. List of Potential Information Requirements in Metal Leaching/ Acid Rock Drainage Assessment and Mitigation Work (MEND Project 5.10E)

  2. Harrison B.. Characterization and Predicted Drainage Chemistry at the Antamina Mine after 10 Years of Operations. Presented at the 2011 workshop.

    KEYWORDS:  Antamina  operating  predevelopment  prediction  segregation  tailings  waste rock 


  3. Taylor L.. Development of a New Mine on a Brownfield Site and Drainage Chemistry: Doyon Mine and Westwood Mine. Presented at the 2018 workshop.

    KEYWORDS:  backfill  closure  construction material  costs  desulphurize  Doyon  encapsulation  flooded  HDS  impoundment  operating  pit  solid residue  tailings  treatment  underground  waste rock  Westwood 


  4. Jensen S. and E. Marquez. How Much Modelling is Too Much Modelling? – Red Chris Mine: A Case Study. Presented at the 2018 workshop.

    KEYWORDS:  hydrology  loading  model  operating  Red Chris  selenium 


  5. Gibson G.. Making Mine Planning Work for Communities from Feasibility Stage Through To Closure: Reflections on the Tlicho Experience in the North, NWT. Presented at the 2012 workshop.

    KEYWORDS:  closure  First Nation  operating  predevelopemnt 


  6. Atherton C. and A. Shaw. Metal Leaching and Acid Rock Drainage Prediction, Prevention and Mitigation at the Brucejack Gold Mine. Presented at the 2018 workshop.

    KEYWORDS:  backfill  Brucejack Sulphurets  flooded underground  kinetic tests  natural lake  operating  paste  prediction  tailings  thicken  treatment  underground  underwater  waste rock 


  7. Day S.. ML/ARD Mitigation at the Red Chris Mine, BC. Presented at the 2018 workshop.

    KEYWORDS:  geology  kinetic tests  mitigation  operating  PAG  pit  Red Chris  segregation  selenium  tailings  waste rock 


  8. Lépine T.. Rockfill Storage Facilities Management – Meadowbank Mine. Presented at the 2018 workshop.

    KEYWORDS:  climate change  construction material  dry cover  freezing  Meadowbank Mine  monitoring  operating  PAG  reclamation  rock cover  segregation  waste rock 


Looking for a past presentation?

Our website includes a database of every presentation made at our annual workshops since our first workshop in 1995. Presentations from past workshops are searchable by key words, mine site, author and year using the search box to the right. Click here for search instructions and to browse a list of selected key words. You can also search by year using the search box to the right.