A. Cheema and A. Gault. Development and Implementation of In-Situ Denitrification Treatment in Gibraltar Mines TSF. Presented at the 2023 workshop.
KEYWORDS: batch blasting residue carbon drainage chemistry Gibraltar monitoring options analysis reduction treatment water management
Meints C. and M. Aziz. Equity Mine - 25 Years of Closure. Presented at the 2018 workshop.
KEYWORDS: batch closure collection construction material discharge drainage chemistry dry cover Equity financial security HDS hydrology impoundment monitoring physical stability prediction receiving environment soil barrier solid residue tailings treatment underwater waste rock
Aubé B.. Les Mines Selbaie, Zinc Removal from Pit Lake: Laboratory, Limnocorals, Batch Pit Treatment. Presented at the 2006 workshop.
KEYWORDS: batch lime pit lake Selbaie treatment
Supporting Documents:
Chevalier P. and C. Hogan. MEND Update - 2018. Presented at the 2019 workshop.
KEYWORDS: batch ferric insitu MEND treatment underwater
Caron D. and B. Huls. Progress and Future Plans for Pit Decommissioning, Selbaie. Presented at the 2006 workshop.
KEYWORDS: active batch lime pit lake Selbaie treatment
Ramsey D.. Sherridon Orphan Mine Site Reclamation Plan. Presented at the 2019 workshop.
KEYWORDS: abandoned amend batch drainage treatment lime options analysis Sherridon tailings