Small A., J. Pugh, J. Stroiazzo and I. Walton. Closure of Jarosite Pond Facility, Timmins, Ontario: Design and Construction. Presented at the 2013 workshop.
KEYWORDS: closure dry cover geomembrane impoundment Kidd Creek lime processing solid-residue treatment
Price W. and M. Aziz. The Flooded Tailings Impoundment at the Equity Silver Mine. Presented at the 2012 workshop.
KEYWORDS: cyanide dam Equity Silver impoundment solid-residue tailings underwater
Kassahun A., U. Jenk, J. Meyer and M. Paul. Wismut's Mine Water Management and Treatment Approaches. Presented at the 2013 workshop.
KEYWORDS: barium ferric HDS in-situ ion exchange solid-residue sulfate reduction treatment uranium Wismut