Small A., J. Pugh, J. Stroiazzo and I. Walton. Closure of Jarosite Pond Facility, Timmins, Ontario: Design and Construction. Presented at the 2013 workshop.
KEYWORDS: closure dry cover geomembrane impoundment Kidd Creek lime processing solid-residue treatment
Nicholson R.. Hardy and Kidd Acid Drainage and Metal Leaching Histories: Contrast and Comparison. Presented at the 2003 workshop.
KEYWORDS: Hardy Kidd Creek lime prediction tailings treatment waste rock
Matthies R. and D. Blowes. Insights into the Fractionation of Stable Isotopes of Post-Transition Elements: Humidity Cell Study of Tailings from Kidd Creek. Presented at the 2012 workshop.
KEYWORDS: humidity cell isotope Kidd Creek
Nicholson R., M. Biglari, M. Venhuis and M. Patterson. Managing Acid Generation and Metal Leaching in High Sulphide Thickened Tailings During Operation: Lessons Learned at Xstrata's Kidd Metsite. Presented at the 2007 workshop.
KEYWORDS: Kidd Creek lime load management prediction tailings thickened treatment
Yaschyshyn D.. Managing Thiosalts at Xstrata Copper Canada - Kidd Operations. Presented at the 2010 workshop.
KEYWORDS: ferric Kidd Creek peroxide processing residue thiosalt treatment
Supporting Documents:
Venhuis M., R. Nicholson and D. Yaschyshyn. Water Quality Expectations for Thickened Tailings and Lessons Learned at the Kidd Metsite TMA, Timmins, Ontario. Presented at the 2011 workshop.
KEYWORDS: deposition hydrology Kidd Creek lime loading prediction tailings thickened treatment