BC MEND ML/ARD Annual Workshop

  1. Jennings S. and P. Castiglione. Applications of Soil Physics for Long-term Monitoring of Soil Water Content in Evapotranspiration Cover Systems in Montana; Case Studies and Equipment Evolution. Presented at the 2009 workshop.

    KEYWORDS:  amend lime  Anaconda  ash  Colstrip  dry cover  monitoring  revegetation  soil barrier  store and release  tailings 


  2. O'Kane M. and L. Barbour. Challenges with measuring cover system performance. Presented at the 2014 workshop.

    KEYWORDS:  Cape Breton  dry cover  monitoring 


  3. Sumi L.. Community Participation in Environmental Monitoring at Mine Sites. Presented at the 2001 workshop.

    KEYWORDS:  community  East Boulder  Ekati  monitoring  Stillwater  Tintaya 


  4. Ayres, B.. Design, Construction, and Performance Monitoring of Cover Systems for Waste Rock and Tailings. Presented at the 2006 workshop.

    KEYWORDS:  climate  dry cover  monitoring  soil barrier  water management  Whistle 


  5. J. Dockrey, D. Flather, L. Findlater, S. Jackson, J. Helsen, J. Scott and J. Gjertsen. Elevated Uranium and Arsenic Concentrations in Baseline Water Quality at the Coffee Gold Site: Implications for Geochemical Predictions. Presented at the 2018 workshop.

    KEYWORDS:  arsenic  Coffee Gold  drainage chemistry  mineralogy  monitoring  prediction  receiving environment  uranium 


  6. Ferguson K. and M. Aziz. Equity Silver Mine - Ten Years Experience with Dry Covers. Presented at the 2000 workshop.

    KEYWORDS:  Equity  financial security  hydrology  lime treatment  monitoring  soil cover 


  7. Aziz M. and K. Ferguson. Equity Silver Mine: Over 10 Years Experience with Dry Covers. Presented at the 2004 workshop.

    KEYWORDS:  climate  dry cover  Equity  hydrology  lime  maintenance costs  model  monitoring  soil barrier  treatment  waste rock 


  8. Rowe R.K.. GMR and GCL covers: what monitoring, maintenance, repair and replacement is needed to ensure and contingency plans are needed for proactive detection and resolution of problems before there are significant environmental impacts. Presented at the 2014 workshop.

    KEYWORDS:  dry cover  GCL  geomembranes  maintenance  monitoring 


  9. Price W.. Information and Design Requirements for Dry Covers. Presented at the 2004 workshop.

    KEYWORDS:  dry cover  guidelines  maintenance  monitoring  revegetation  soil barrier  water management 

    Supporting Documents:

    1. Excerpts from Guidelines for Metal Leaching and Acid Rock Drainage at Minesites in British Columbia
    2. Excerpts from List of Potential Information Requirements in Metal Leaching and Acid Rock Drainage Assessment and Mitigation Work

  10. Cowan D. and B. Mattson. ML/ARD Program at Quinsam Coal. Presented at the 2014 workshop.

    KEYWORDS:  backfill  bulkhead  coarse coal reject  flooded underground  impoundment  monitoring  PAG  pit lake  Quinsam Coal  segregation  underwater 


  11. A-M. Sam and R. Sam. Nak’Azdli Whut’en Perspective on Mine Reclamation and Environmental Protection (presentation not submitted). Presented at the 2018 workshop.

    KEYWORDS:  community  First Nation  monitoring  receiving environment  stakeholder presentation not submitted 


  12. O'Kane M., B. Ayres, L. Barber, D. Hiller and D. Helps. Performance of an Engineered Cover System After Six Years at the Areva Resources Cluff Lake Mine Waste Rock Pile in Northern Saskatchewan. Presented at the 2013 workshop.

    KEYWORDS:  Cluff Lake  monitoring  soil barrier  store and release  waste rock 


  13. O'Kane M.. Practical Use of MEND Report 2.21.4: Design, Construction & Performance Monitoring of Cover Systems for Waste Rock and Tailings. Presented at the 2004 workshop.

    KEYWORDS:  dry cover  guidelines  model  monitoring 


  14. A. Sobolewski, T. Moore, T.R. Brown, A.C. Riese and J. Fricke. Use of Constructed Wetlands to Reduce Metals in Drainage from a High Altitude Mine System, SW Colorado: Horizontal System. Presented at the 2018 workshop.

    KEYWORDS:  drainage treatment  flocculent  limestone bed  monitoring  passive  settling  sulphate reduction  temperature  wetland 


  15. De Vos K.. Whistle Waste Rock Pile Monitoring. Presented at the 1996 workshop.

    KEYWORDS:  drainage chemistry  gas  monitoring  prediction  temperature  waste rock  Whistle 


Looking for a past presentation?

Our website includes a database of every presentation made at our annual workshops. Use the search tools to the right to find the presentation you are looking for. If you can’t find what you’re after, please feel free to contact us. Click here to browse a list of selected keywords.